Membership and payment
mandatory
CALGARY / HOMEOWNERS’ ASSOCIATION
Cornerstone Homeowners Association
Cornerstone has a title-linked maintenance HOA. The developer publishes an undated annual amount, but inconsistent payment dates require management confirmation.
No individual title, account balance or household access is certified here. A maintenance boundary, nearby amenity or condo fee does not settle those questions.
01 / FOLLOW THE MONEY
| Property / fee class | Amount | Tax & applicability |
|---|---|---|
| Published annual assessment | $52.50 | GST included |
Published late-payment information: Resource page states 18% annually (1.5% monthly); confirm applicable start date and current policy.
2026 is retrieval ordering only, not a confirmed fee year. Payment deadline is unresolved.
Original field review: Sep 6, 2026. Recheck for later notices.
02 / THE PROPERTY CONTEXT
mandatory
yes
The developer describes title-linked membership for homeowners. Confirm the legal lot and registered instrument; no parcel map is verified here.
Current registration, voting and eligibility conditions require confirmation; do not infer transferable privileges from an owner fee.
No specific source attached to this item. Confirm before relying on it.
03 / THE PROPERTY CONTEXT
Supports supplementary landscape and entry-feature upkeep, asset reserves and administration.
04 / THE PROPERTY CONTEXT
Access: unknown. Fee funding: reported.
05 / THE PROPERTY CONTEXT
The page says April 1, invoices by April 30 and an April–August payment window. No single due date is verified.
The 2016 bylaws connect membership to ownership, prescribe a designated member for joint owners and include residence and age conditions with developer exceptions. Current treatment of rented homes needs written confirmation.
Bylaw 7 references subdivision, encumbrance, single-family and multi-family architectural, reserve, utility-lot and landscaping schedules. These are absent from the linked 22-page PDF; specific design standards cannot be established from it.
The signed bylaws call for annual financial reporting and auditing. Obtain the latest statements and amendments; this historical requirement is not proof that current reports have been supplied.
The developer describes a two-year post-construction maintenance period and subsequent handover. Confirm the responsible party for the particular asset rather than assuming every park, road or pathway is already an HOA responsibility.
06 / THE PROPERTY CONTEXT
Exact current maintenance boundaries and private recreation privileges need confirmation.
No specific source attached to this item. Confirm before relying on it.
07 / THE PROPERTY CONTEXT
Developer uses both encumbrance and restrictive-covenant terminology. Obtain the registered instrument to establish its form and terms. Specific residential lot or condominium unit; verify title.
unknown
No specific source attached to this item. Confirm before relying on it.
BEFORE YOU RELY ON IT
READ THE ORIGINAL
Selected membership, schedule and financial clauses visually reviewed. Referenced schedules and current amendments remain outstanding.
THE EVIDENCE TRAIL
Imported source-linked research; original field review dates retained.
Reconciled on Sep 22, 2026 from HomeownersAssociation.ca’s existing profile. Importing does not refresh the underlying verification dates.
A source reference is not a full-document review. Dates and scope below belong to the underlying research, not this page’s publication date.
Housing and construction-period tables on pages 19–20 read; page 20 visually checked. Census rounding applies. Not current inventory, tenure, legal suite status or membership data.
Historical route redesign. Current stop locations, timetable and construction detours require trip-planner confirmation.
Project listing reviewed. Project approval and capacity do not establish an opening date or attendance assignment.
Developer reports October 15, 2024 opening of the first of three planned park areas. Later phase completion not verified.
Undated fee; conflicting April 1 deadline, April 30 invoice timing and April–August payment window. Confirm directly with management.
22 scanned pages, printed pages 3–24. Visually reviewed printed pages 3, 5–9 and 20–24. Schedules A–G are referenced but absent from this PDF. Remaining clauses and current amendments need review.